Skip to content

The Primavera Emperor Has No Clothes

Quality, Consequences and the Construction Industrial Complex (part 90) - All IMHO:As a construction industrial complex court jester I can declare, "the Primavera emperor has no clothes"! Among the many delusions in the construction business, the emphasis given to the Primavera project programme (schedule, if you are North American) as a project management…

keep reading

Single Point of Effectiveness and VAV Systems

Quality, Consequences and the Construction Industrial Complex (part 89) - All IMHO: I want to introduce into the property development and HVAC lexicon a new term, "Single Point of Effectiveness” (SPE).  How does this matter? It is the difference between an HVAC system working efficiently or in some cases not working at all. Lets…

keep reading

HVAC – The Low Consequences Game

Quality, Consequences and the Construction Industrial Complex (part 88) - All IMHO:HVAC design and installation is a low consequences environment. The antidote, consumer disobedience!  If a HVAC design engineer messes up nobody dies, people just get hot or cold. However, if a structural engineer messes up the consequences can be huge and in…

keep reading

You Cannot Manage What You Do Not Measure

Quality, Consequences and the Construction Industrial Complex (part 87) - All IMHO:"You cannot manage what you do not measure” is an old management adage that I think is applicable to property development and project management. Lets break this down:"Manage": Verb; be in charge of, run, administer i.e. run the show"Measure": Verb;…

keep reading

The Global Calculator

Quality, Consequences and the Construction Industrial Complex (part 86) - All IMHO:Catching up on my reading while traveling, I read about an interesting tool (RICS July/Aug 2015 Modus)  modestly called the “Global Calculator” ( http://tool.globalcalculator.org ). So how is it interesting? Firstly I assume it was named by Dr Evil or some other megalomaniac. As…

keep reading
Back To Top