Skip to content

Chillers – Read the Small Print!

Quality, Consequences and the Construction Industrial Complex (part 66) - All IMHO:Caveat emptor!When buying, installing and Commissioning a chiller, close attention should be paid to the terms and conditions of sale and warranty on the manufacturers order. As an empiricist, I am always looking for answers to problems I experience. Also…

keep reading

Respect the VAV System Static Pressure Sensor!

Quality, Consequences and the Construction Industrial Complex (part 64) - All IMHO:Assuming design and installation are correct (a huge assumption), there are two system Commissioning tasks that massively impact VAV system operational efficiency, indoor air quality (IAQ) and energy use; Setting up the minimum outside air flow rates and their…

keep reading

Process Vs SME Project Management – Who Wins?

Quality, Consequences and the Construction Industrial Complex (part 63) - All IMHO:Should a project manager be a Subject Matter Expert (SME) or a generic project management Process Expert (PMP)? For the property industry I think this is a RICS Vs PMP discussion.  To start we should define projects and project management. A…

keep reading
Back To Top