skip to Main Content
Menu

MEP Engineering is a Weak Link Game

  • June 23, 2016
Quality, Consequences and the Construction Industrial Complex (part 75) – All IMHO: Breakthroughs come from unlikely places. Recently one came from a Malcolm Gladwell podcast referencing a book call “The Numbers Game” (a book about soccer by two economists, Chris…
keep reading

Clarity Equals Results – CxA Sampling Rates

  • June 16, 2016
Quality, Consequences and the Construction Industrial Complex (part 69) – All IMHO: ANSI/ASHRAE/IES Standard 202-2013 (Commissioning Process for Buildings & Systems, Appendix B, page 15) requires a quality based sampling process for verification as part of the Commissioning process and this…
keep reading

Hotel Design – How Many Stars?

  • June 9, 2016
Quality, Consequences and the Construction Industrial Complex (part 68) – All IMHO: What is going on with hotels? This is whats going on; 5 star hotels with 3 star building services. Travelling with work means I am fortunate to stay…
keep reading
Load More
Back To Top
Close search
Search